GENERATION · NETWORKS · ELECTRICITY DEMAND

Cables & grid projects

Explore operating assets, construction and proposals across the electricity system. Find the capacity, planning status and evidence behind each project.

10Matching project records
0Operating records
0Construction or enabling works
July 2026Official renewable register edition
Cables transfer electricity; their MW ratings are not generating capacity. EGL2 connects Peterhead to Drax. EGL1, EGL3, EGL4 and EGL5 have different endpoints and delivery stages.
Reset filters

Project map

Use the map to explore the matching projects. Solid markers show published or mapped points; shaded dashed circles show approximate areas. Cable endpoints are shown separately.

Loading OpenStreetMap…

10 results

Understand capacity and annual energy →
Grid upgrades

Beauly–Peterhead 400 kV Overhead Line

In planning
Not published

AC network reinforcement

Highlands / Moray / Aberdeenshire · Scotland

SSEN Transmission

SSEN submitted its overhead-line consent application in October 2025. The proposal strengthens the inland transmission route to Peterhead. A submitted application is distinct from consent or main construction.

Transmission links

Eastern Green Link 3 (Peterhead–West Norfolk)

In planning
2,000 MW

Transfer capacity

Aberdeenshire / Lincolnshire / Norfolk · United Kingdom

SSEN Transmission / National Grid

Major converter and cable contracts were announced in March 2026. Planning and consultation continue. EGL3 and EGL4 share proposed English landfall and cable corridors, with separate converter stations in the Walpole area. Contract awards are not evidence that the complete link is already under construction.

Transmission links

Eastern Green Link 4 (Fife–West Norfolk)

In planning
2,000 MW

Transfer capacity

Fife / Lincolnshire / Norfolk · United Kingdom

SP Energy Networks / National Grid

Supply-chain agreements were announced in March 2026. Main construction is expected in 2028 subject to consent, with completion scheduled for 2033. The proposed English converter is in West Norfolk; older descriptions of a Lincolnshire endpoint can confuse the cable landfall with the grid connection.

Transmission links

Eastern Green Link 5

In planning
Not published

Not yet confirmed

Scotland / Lincolnshire · United Kingdom

SSEN Transmission / National Grid

Second-stage consultation took place from May to July 2026. EGL5 is a further Scotland–England subsea connection proposal, separate from EGL3 and EGL4. The proposed Lincolnshire connection relates to the LCS-B substation within the Grimsby to Walpole scheme.

Grid upgrades

Kintore–Tealing 400 kV Connection

In planning
Not published

AC network reinforcement

Aberdeenshire / Angus · Scotland

SSEN Transmission

The overhead-line application was submitted in September 2025 and is in the consent process. Government case material records an inquiry. The proposed reinforcement should be distinguished from separate substation work packages and existing network assets.

Interconnectors

LionLink Offshore Hybrid Asset

In planning
2,000 MW

Maximum export connection

Suffolk / Netherlands · United Kingdom

National Grid Ventures / TenneT

LionLink combines a connection to Dutch offshore wind with electricity exchange between Britain and the Netherlands. Current connection documents distinguish up to 2 GW export from 1.8 GW import. It remains a proposed project, not an operational source of supply.

Interconnectors

Nautilus Interconnector

In planning
1,400 MW

Transfer capacity

Great Britain / Belgium · United Kingdom

National Grid Ventures

National Grid is refining plans for a new British–Belgian subsea electricity connection. The earlier Suffolk connection agreement was removed; that should not be reported as the cancellation of all Nautilus development. Current route and converter options require further confirmation.

Transmission links

Sea Link (Suffolk–Kent)

In planning
Not published

Transfer rating not verified

Suffolk / Kent · England

National Grid

A 138 km primarily offshore link is awaiting its development-consent decision, expected by 30 October 2026. Surveys and archaeological works have separate permissions. These preparatory activities do not establish consent for the main link, whose construction programme is conditional on approval.

Grid upgrades

Spittal–Loch Buidhe–Beauly 400 kV Connection

In planning
Not published

AC network reinforcement

Caithness / Sutherland / Highlands · Scotland

SSEN Transmission

The proposed 400 kV route is undergoing the consent process. The government’s appeal and inquiry record identifies inquiry, hearing and written procedures in 2026. This is not reported here as a consented or operating line.

Transmission links

Western Link 2

In planning
Not published

Rating requires confirmation

Ayrshire / Gwynedd · United Kingdom

SP Energy Networks / National Grid

Western Link 2 is a proposed predominantly subsea connection from Ayrshire to the Gwynedd coast. A new converter would connect to Pentir substation. Public consultation took place in 2026. The project is separate from the operating Western Link.

GRID CONTEXT

Great Britain electricity now

Explore the grid →
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.