Cables transfer electricity; their MW ratings are not generating capacity. EGL2 connects Peterhead to Drax. EGL1, EGL3, EGL4 and EGL5 have different endpoints and delivery stages.
InterconnectorsOperating
1,000 MW
Transfer capacity
Isle of Grain โ Maasvlakte, Netherlands ยท United Kingdom
National Grid Ventures / partner operator
BritNed is an operating international electricity connection. Power can move between markets rather than being generated by the cable. Availability, outages and market schedules determine the usable transfer on a particular day.
Transmission linksOperating
1,200 MW
Transfer capacity
Caithness / Moray ยท Scotland
SSEN Transmission
The completed HVDC link transfers northern Scottish renewable electricity through the Moray Firth. Its 1.2 GW rating is the linkโs transfer capability, rather than energy generated by the cable. It is part of the network into which the Shetland connection integrates.
InterconnectorsOperating
500 MW
Transfer capacity
Pembrokeshire / Ireland ยท United Kingdom
Greenlink
Greenlink links the Irish and British electricity markets through subsea and underground cable. The developerโs FAQ records operation from February 2025. Its nominal 500 MW capacity is bidirectional transfer capability, not a constant flow.
InterconnectorsOperating
2,000 MW
Transfer capacity
Kent โ northern France ยท United Kingdom
National Grid Ventures / partner operator
IFA is an operating international electricity connection. Power can move between markets rather than being generated by the cable. Availability, outages and market schedules determine the usable transfer on a particular day.
InterconnectorsOperating
1,000 MW
Transfer capacity
Southern England โ Normandy, France ยท United Kingdom
National Grid Ventures / partner operator
IFA2 is an operating international electricity connection. Power can move between markets rather than being generated by the cable. Availability, outages and market schedules determine the usable transfer on a particular day.
InterconnectorsOperating
1,000 MW
Transfer capacity
Kent โ Belgium ยท United Kingdom
National Grid Ventures / partner operator
Nemo Link is an operating international electricity connection. Power can move between markets rather than being generated by the cable. Availability, outages and market schedules determine the usable transfer on a particular day.
InterconnectorsOperating
1,400 MW
Transfer capacity
Blyth, Northumberland โ Kvilldal, Norway ยท United Kingdom
National Grid Ventures / partner operator
North Sea Link is an operating international electricity connection. Power can move between markets rather than being generated by the cable. Availability, outages and market schedules determine the usable transfer on a particular day.
Transmission linksOperating
600 MW
Transfer capacity
Shetland / Caithness ยท Scotland
SSEN Transmission
The Shetland connection was energised in 2024. Its 260 km subsea link integrates with the CaithnessโMoray system. It connects island renewable generation, including the Viking wind farm, while providing a connection for island electricity supply.
InterconnectorsOperating
1,400 MW
Transfer capacity
Bicker Fen, Lincolnshire โ Revsing, Denmark ยท United Kingdom
National Grid Ventures / partner operator
Viking Link is an operating international electricity connection. Power can move between markets rather than being generated by the cable. Availability, outages and market schedules determine the usable transfer on a particular day.
Transmission linksOperating
2,200 MW
Published transfer capacity
Ayrshire / North Wales ยท United Kingdom
SP Energy Networks / National Grid
The operating Western Link connects Hunterston to Flintshire Bridge. Its route is approximately 420 km, including 385 km subsea. It carries electricity between Scotland and Wales and is a separate asset from the proposed Western Link 2.