United States › Grid › Interconnection queues › Mississippi

BATTERY STORAGE · SOUTHEAST

Battery storage project 25RSC-013, Lowndes County

Battery storage project 25RSC-013, Lowndes County is a 200 MW battery storage request in interconnection study in the Southeast interconnection queue, in Lowndes County, Mississippi, connecting to Tennessee Valley Authority.

Queue statusIn planning
  1. PlanningQueued Aug 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Aug 2031 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
25RSC-013
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Tennessee Valley Authority
Connection point (POI)
TVA'S LOWNDES, MS 500KV SUBSTATION
Location
Lowndes County, Mississippi
Technology
Battery: 200 MW
Total requested
200 MW
Study phase
In Progress (unknown study)
Queue status
Active
Entered queue
1 August 2025
Proposed online date
August 2031

Location

Marker shows the centre of Lowndes County; the queue data does not give exact sites.

Power plants in Mississippi · Transmission lines in Mississippi

Other requests in Lowndes County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem