United States › Grid › Interconnection queues › Maryland

BATTERY STORAGE · PJM

Chesapeake Beach BESS

Chesapeake Beach BESS is a 1.0 MW battery storage request built and operating in the PJM interconnection queue, in Calvert County, Maryland, connecting to BGE.

Queue statusOperating
  1. PlanningQueued Nov 2020 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingMay 2023 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
AG2-050
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
BGE
Connection point (POI)
Randle Cliff 13.8 kV
Location
Calvert County, Maryland
Technology
Battery: 1.0 MW
Total requested
1.0 MW
Service type
Energy only (ERIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
Queue status
Operational
Entered queue
25 November 2020
Proposed online date
May 2023
Came online
May 2023

Location

Marker shows the centre of Calvert County; the queue data does not give exact sites.

Power plants in Maryland · Transmission lines in Maryland

Other requests in Calvert County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem